- home ›
- canals & rivers ›
- river ure ›
- boating ›
- stoppages
Stoppages Results
Works which make up part of the 2010-2011 winter stoppage programme have been highlighted in blue
Results 1-1 of 1
River Ure »
-
Restriction: Milby Lock
07 May 2010 until further notice
Associated Regional Office: North East Waterways
This notice supersedes notice NES11. The failed sluice on the north bank at the head gates at Milby Lock has been sealed and isolated until a new sluice door can be fabricated and fitted.
The lock can be operated as using the sluice on the south bank head gates. Users of the lock may notice that the lock will be slower to fill. British Waterways apologises for any inconvenience or delay this may cause(Enquiries: 0113 2816860)
Results 1-1 of 1
