17 Aug 2007 until further notice

Restriction: Doncaster Lock to Spotborough River Section

Associated Regional Office: BW Yorkshire

Following the recent heavy floods in South Yorkshire and the continuing build up of silt it has become necessary to implement a draft restriction of 7ft 4 maximum at normal water levels to all craft.

(Enquiries: 0113 281 6860)

 
15 Jul 2009 until further notice

Restriction: Railway Bridge 19, South Thorne

Associated Regional Office: BW Yorkshire

Network rail are repairing the railway track supports over the canal bridge. During the works temporary scaffolding will be erected to protect the canal from any possible falls of materials or tools.

Although normal canal headroom will not be affected, there may be some short delays whilst the scaffolding is installed and the later removed.

It is not expected that the works will affect canal traffic. A lookout will be in place to watch for approaching boats and to stop the works and make the site safe before they arrive.

Craft should take care when approaching the site and be prepared to stop and wait if requested to do so, whilst a safe route is cleared.

These works should last approx. 4 weeks but until finished.

(Enquiries: 0113 281 6860)

 
15 Jul 2009 until further notice

Restriction: Railway Bridge 19, South Thorne

Associated Regional Office: BW Yorkshire

Network rail are repairing the railway track supports over the canal bridge. During the works temporary scaffolding will be erected to protect the canal from any possible falls of materials or tools.

Although normal canal headroom will not be affected, there may be some short delays whilst the scaffolding is installed and the later removed.

It is not expected that the works will affect canal traffic. A lookout will be in place to watch for approaching boats and to stop the works and make the site safe before they arrive.

Craft should take care when approaching the site and be prepared to stop and wait if requested to do so, whilst a safe route is cleared.

These works should last approx. 4 weeks but until finished.

(Enquiries: 0113 281 6860)

 
31 Jul 2009 until further notice

Restriction: Bridge 32A, Rotherham Centre

Associated Regional Office: BW Yorkshire

The debris in the canal has now been booyed off. There is half a channel navigable at a depth of 1.8 metres. Going downstream proceed on the left and going upstream proceed on the right.

PLEASE APPROACH WITH CAUTION AND PROCEED SLOWLY

(Enquiries: 0113 2816860)

 
20 Aug 2009 until further notice

Restriction: Greasebrough Road Bridge to Barnby Dun Bridge

Associated Regional Office: BW Yorkshire

Following recent flooding hydrographic survey results have indicated a number of isolated areas of reduced depth between the above locations. Dredging works have now been planned to address these areas. Until the dredging is complete a draft restriction of 2.2m (7'4") will be implemented.

(Enquiries: 0113 2816860)

 
12 Nov 2009 until further notice

Opening Times: Tinsley Flight

Associated Regional Office: North East Waterways

UPDATE (21 December 2009): CHRISTMAS AND NEW YEAR OPENING TIMES

The Tinsley flight will be Closed 25th-28th December. It Re-opens for the 29th,30th,31st December.Closed on the 1st Jan 2010 and then re-opens as usual from the 2nd Jan 2010.



Tinsley Flight: Open 8.00am - 4.00pm every day except Christmas Day, Boxing Day and New Years' Day. Last passage time down/up the flight is 12.30 to allow customers to complete the flight by 4.00pm. We advise non-stop passage on this section. Minimum 24 hour's notice required. Please contact the Lock Keeper to book passage on 07710175488

(Enquiries: 07710175488)

 
19 Feb 2010 until further notice

Restriction: Between Thorne Lock and Bramwith Lock

Associated Regional Office: North East Waterways

There are 2 sunken cars in the canal along this section. Please proceed with caution whilst travelling. Our crane boat will travel to site and we are planning to remove the cars as soon as possible. There may be a short delay whilst our Crane Boat carries out the removal of the car from the canal. British Waterways apologise for the inconvenience

(Enquiries: 0113 2816800)

 
20 Feb 2010 - 10 Jul 2010

Stoppage: Doncaster Lock

Associated Regional Office: North East Waterways

Passage through Doncaster Lock will not be permitted between 22.00 every Saturday night until 06.00am each Sunday morning between the 20th February until the 10th July. This is for emergency repair works on the railway bridge above the locks. British Waterways apologise for the inconvenience.

(Enquiries: 0113 2816800)

 
22 Feb 2010 - 26 Mar 2010

Restriction: Kirk Sandall, Doncaster (between St Oswald’s Church and Long Sandall Ings)

Associated Regional Office: North East Waterways

Works are being undertaken on adjacent land at Long Sandall Ings. Materials will be transported using the navigation. Tugs and hoppers will be loading at St Oswald’s car park and unloading at Long Sandall Ings.Warning notices will be placed either side of the working area. Skippers of vessels should slow down, approach with caution and be prepared to follow any instructions given by site staff whilst passing the works. British Waterways apologise for any inconvenience caused

(Enquiries: 0113 2816800)

 
22 Feb 2010 - 02 Apr 2010

Restriction: Doncaster Lock

Associated Regional Office: North East Waterways

Passage through Doncaster Lock will be restricted for up to 30 minutes each weekday from the 22nd February 2010 until 2nd April 2010. These restrictions are to allow workboats being used for emergency repairs to the rail bridge above the lock to move out of the way. British Waterways apologise for any inconvenience.

(Enquiries: 0113 2816800)

 
23 - 26 Mar 2010

Restriction: Railway Bridge next to the Mexborough new cut

Associated Regional Office: North East Waterways

Works Infrastructure, on behalf of Network Rail, are carrying out inspections of the railway bridge from a boat, which may cause delays of up to 30 mins whilst the boat is moved. Mooring areas will be arranged upstream and downstream of the bridge and look outs will advise on the extent of the delays

(Enquiries: 0113 2816800)

 
09 Apr 2010 - 09 Jul 2010

Restriction: Doncaster Lock

Associated Regional Office: North East Waterways

Passage through Doncaster Lock will be restricted for up to 30 minutes every Friday from 9th April 2010 until 9th July 2010. These restrictions are to allow workboats being used for emergency repairs to the rail bridge above the lock to move out of the way. British Waterways apologise for any inconvenience.

(Enquiries: 0113 2816800)

 

Results 1-12 of 12