Stoppages Results
Works which make up part of the 2010-2011 winter stoppage programme have been highlighted in blue
Results 1-7 of 7
Shropshire Union Canal »
-
Stoppage: Lower Basin Washwall to Wide Lock Approach, Ellesmere Port
24 Jul 2006 until further notice
Associated Regional Office: Non BW Region
UPDATE (19 April 2010): Feasiblity studies are currently underway to determine the scope of the repair works required to the lower basin washwall on the Bottom Wide Lock approach. Passage continues to be unavailable for wide beamed craft until further notice.
Due to structural failure of the dock wall, Whitby Wide Bottom Lock has been closed on safety grounds until further notice while investigation works are completed. Further updates will be available shortly. British Waterways apologises for any inconvenience caused.
Update: The wall has now been stabilised at this lock. From Thursday 17 August 2006 it will be possible for passage to be made through the narrow lock as normal. For swing bridge operation, the Cheshire West & Chester Council should be contacted direct as usual. Monitoring of the wall will continue until a permanent solution has been completed. The wide lock will remain closed until that point.
(Enquiries: 01606 723800)
-
Opening Times: Dee Branch
02 Nov 2009 until further notice
Associated Regional Office: North Wales & Borders Waterways
Passage is available if booked 7 days in advance T 01606 723800 during normal office hours Monday to Friday. Tidal constraints apply and there will be an out of hours passage charge of £131.40 plus VAT.
(Enquiries: 01606 723800)
-
Restriction: Dredging Works from Audlem Lock 15 to Adderley Bridge 69
21 Nov 2011 - 22 Feb 2012
Associated Regional Office: North Wales & Borders Waterways
The works are to bring the canal up to Minimum Open Channel Compliance and dredge moorings.
Boaters should approach the dredger with caution and await a signal from the dredger driver or banksmen to pass. Users may be delayed up to 30mins max.
Users should note, restrictions to the towpath are only in force while offloading takes place but in most cases no delays will occur.
British Waterways apologise for any inconvenience caused.(Enquiries: 01606 723800)
-
Stoppage: Greenfield Lock 8
04 Jan 2012 - 10 Feb 2012
Associated Regional Office: North Wales & Borders Waterways
Replacement of bottom gates. Brickwork repairs.
(Enquiries: 01923 201120)
-
Stoppage: Northgate Lock 1
04 Jan 2012 - 10 Feb 2012
Associated Regional Office: North Wales & Borders Waterways
Replacement of bottom gates. Masonry repairs.
(Enquiries: 01923 201120)
-
Stoppage: Ellesmere Port Bottom Narrow Lock
13 Feb 2012 - 09 Mar 2012
Associated Regional Office: North Wales & Borders Waterways
Replacement of top end mitre gates. General brickwork repairs.
(Enquiries: 01923 201120)
-
Stoppage: Powell's Bridge 147 to M53 Bridge 144A
20 Feb 2012 - 02 Mar 2012
Associated Regional Office: North Wales & Borders Waterways
National Grid Gas to carry out pipe recoating works to gas pipe crossings adjacent to Powell's Bridge 147 and M53 Motorway Bridge 144A.
(Enquiries: 01923 201120)
The towpath is also closed
Results 1-7 of 7