You are here:

Stoppage: Greenfield Lock 8

Waterway: Shropshire Union Canal »

From 04/01/2012 to 10/02/2012

Is Date Flexible?: All stoppages on the Shropshire Union Canal to take place post Christmas. Stoppage Rationale is to maintain a North - South route during the stoppage season. Hence Manchester and Pennines Waterway and Central Shires Waterway are not planning to undertake stoppages on the Trent and Mersey Canal (up to the junction with the Coventry Canal) post Christmas.

Assets affected:

  • lock

Reasons for work:

  • repair
  • maintenance

Replacement of bottom gates. Brickwork repairs.

Nearest upstream winding: Quarry Bridge Winding Hole

Nearest downstream winding: Cow Lane Winding Hole