You are here:

Stoppage: Fishery Lock 63

Waterway: Grand Union Canal »

From 27/02/2012 to 09/03/2012

Assets affected:

  • lock

Reasons for work:

  • repair

Repair to leaking bottom gates plus general repairs to top gates and lock structure.

Repair to leaking bottom gates. General repairs to top gates and lock structure.

Nearest upstream winding: Below Lock 61

Nearest downstream winding: Below Lock 67