Stoppage: Winkwell Swingbridge. Bridge 147

Waterway: Grand Union Canal »

From 04/01/2012 to 09/03/2012

Is Date Flexible?: Specific dates of stoppage will be advertised via waterscape.com when finalised.

Assets affected:

  • bridge

Reasons for work:

  • repair
  • (re)construction
UPDATE (12 December 2011): Following investigation of the works to be carried out, it has been identified that a full stoppage is not required.
Works will be carried out with only short restrictions to navigation.

Refurbishment of mechanical and electrical operating components. Repairs to bridge decking.

Refurbishment of mechanical and electrical components. Repairs to bridge decking.

Nearest upstream winding: Above Lock 46

Nearest downstream winding: Below Lock 61