You are here:

Stoppage: Sappi Graphics, Nash Mills

Waterway: Grand Union Canal »

From 01/02/2012 to 09/03/2012

Is Date Flexible?: This site is between Nash Mills Lock 68 and Red Lion Lock 69.

Assets affected:

  • bridge

Reasons for work:

  • 3rd party works

Third party works to install a footbridge over the canal.

Nearest upstream winding: Above Lock 68

Nearest downstream winding: Between Bridge 155 and 157