From 30/01/2012 to 07/03/2012

Is Date Flexible?: This stoppage has now been swapped with the Burnt Mill Lock stoppage. This swap is due to heavy siltation within the lock which has caused problems in getting the exact gate measurements. Bottom Lock stoppage (Hertford Union) was originally scheduled to start on 07/11/2011 for 5 weeks.

Assets affected:

  • lock

Reasons for work:

  • (re)construction

Installation of new bottom and top lock gates and other lock repair works.

Installation of new bottom and top lock gates.

The installation of new bottom and top lock gates.

Please note this stoppage has been extended till 4pm on Wednesday. Navigation will open after this time.

Nearest upstream winding: On the Regents Canal at the junction of the Hertford Union south of Bridge 54A (Old Ford Road Bridge).

Nearest downstream winding: On the Lee Navigation at the junction of the Hertford Union downstream from Bridge 11 (Carpenters Road bridge, A115).