You are here:

Stoppage: From Wharf Road bridge 300 m eastwards along the towpath opposite Wenlock Basin.-Regents Canal

Waterway: Regent's Canal »

From 31/10/2011 to 14/05/2012

A scaffold is erected on the towpath. The towpath is closed from 31/10/11 to 03/11/11. It will remain open until the scaffold is removed and again closed. The works should be completed by mid May 2012. The exact towpath closure dates will be advertised on site. Please follow the diversion route along the public highway as displayed on the maps at the worksite. The moorings from Wharf Rd bridge eastwards also the length of Baldwin Terrace (over the length of the scaffold) are suspended for the duration of the works. Please use alternative moorings in the area.