You are here:

Restriction: Mon & Brecon Cycleway Phase II - TOWPATH CLOSURE ONLY


Waterway: Monmouthshire & Brecon Canal »

From 30/01/2012 to 30/03/2012

UPDATE (30 January 2012): Updated: Correct Information - British Watereways apologies for previous notice - please find below correct information:

To facilitate installation and improvements to the towpath surface the towpath shall be closed between Bridges 62 and 74. There will be works proceeding at 4 separate locations on the above length. It is proposed that wherever possible the towpath will remain open apart from those lengths where works are actually being undertaken, but due to the unknown rate of progress it will not be possible to accurately predict when these closures will be needed. Maps will be posted to advise users of the possible diversion routes.

The canal is being dewatered between Bridges 62 and 66 and the towpath shall be closed between Bridges 62 and 74. There will be works proceeding at 4 separate locations on the above length. It is proposed that wherever possible the towpath will remain open apart from those lengths where works are actually being undertaken, but due to the unknown rate of progress it will not be possible to accurately predict when these closures will be needed. Maps will be posted to advise users of the possible diversion routes.

Project Manager for these works: Simon Hughes BEng(Hons) CEng MICE Project Team Manager – Wales & West British Waterways Canal Lane Hatton Warwick CV35 7JL

T 01926 622739 M 07710 175490 F 01926 626199