You are here:

Restriction: Lock 32, Turnerwood Browns to Lock 33, Turnerwood Double Bottom (Top) to Lock 36, Turnerwood Top Lock


Waterway: Chesterfield Canal »

From 08/02/2012 to 08/02/2012

As part of some leak sealing work just upstream of Lock 33, Turnerwood Double Bottom (Top). A partial dewater is required to carry out some lock approach re-pointing work.

In conjunction with this, there will be some disturbance on the towpath as a mini digger will have to dig down to install a clay curtain behind the washwall.

British Waterways apologises for any inconvenience this may cause.

Please expect delays of up to 1 hour maximum.

Please note this dewater may not be required dependant on the success of the towpath sealing work carried out at the same time.