For people who care about Britain’s canals and rivers
Waterway: Grand Union Canal Leicester Line »
From 17/03/2012 to 01/04/2012
As a result of the continued dry weather, the reservoirs which supply the GU Leicester Line are not re-filling as planned, so work needs to be undertaken to reduce water loss on the canal to prolong the 2012 cruising season.
Therefore, the canal will be closed to allow the 8 locks to be drained and have all the gates re-lined to reduce water leakage through them.
The nearest winding hole to Lock 31 is upstream of Lock 30 (Kilby Lock).
The 8 locks within this section will be drained and the water level in the adjacent pounds will also be lowered. Therefore, no boats will be permitted to moor within this length for the duration of the works.
British Waterways apologise for any inconvenience this may cause.
© 2012 Waterscape.com, British Waterways' leisure website. All rights reserved. Reproduction of this website in whole or in part, in any form or medium without out express written permission is prohibited. Your use of this website is subject to our legal terms of use. Your personal information is protected by our privacy policy. If you purchase holidays, accommodation or other products through this website,you do so subject to our partners' conditions of sale. View our sitemap. Feedback? Contact us.