You are here:

Stoppage: Grand Union Canal Aylesbury Arm

Waterway: Aylesbury Arm (Grand Union Canal) »

From 15/03/2012 to 13/06/2012

UPDATE (13 June 2012): The Grand Union Canal, Aylesbury Arm will now be fully open with immediate effect.

Should any local misuse occur which impacts on the water conservation requirements, we will consider locking up at the end of the day at specific locations.

It continues to be essential that boaters conserve water by adhering to the Thrift code.

There is a continuing full closure of the Aylesbury Arm at Lock 1.

It will be open to traffic at specified weekends through the season, 23rd-25th March 2012 and 20th-22nd April have already been specified.