Stoppages Results
Advice: Wakefield Flood Lock, Fall Ings Cut - Calder & Hebble
Associated Regional Office: BW YorkshireBW are pleased to inform you that the works being undertaken by CTP St James in conjunction with the Wakefield Headland Development which required a stoppage are now complete and the canal has been re-opened.
Thank you for your co-operation during this extended stoppage and please continue to take caution whilst navigating through the Flood Lock as works are still required to complete the stonework on the lock walls. These works will not restrict passage for any craft.
(Enquiries: 0113 281 6860)
Advice: Figure of Three Locks
Associated Regional Office: BW YorkshireThe navigation at this point is now passable with extreme care. Please note that the towpath is not accessible at this time.
(Enquiries: 0113 281 6860)
Restriction: Salterhebble Guillotine Lock
Associated Regional Office: BW YorkshireUpdate (22 August): The restricted service will continue at Salterhebble Guillotine Lock for the foreseeable future. A further update will be issued shortly. British Waterways apologises for any inconvenience caused.
Update (18 July 2008): The gear box on top of the guillotine has broken, rendering the lock inoperable by customers. The design has been completed, materials are being procured prior to fabrication.
The restricted service will continue at Salterhebble Guillotine Lock and an update will be issued on Friday 22nd August. The lock will continue to be operated on a restricted service, operated by BW staff from 9am - 10am, 12 noon - 2pm and 4pm - 6pm daily.
(Enquiries: 0113 281 6860)
Restriction: Calder River Bridge, Ravensthorpe
Associated Regional Office: BW YorkshireMajor third party works Project to strengthen the road bridge. Scaffold to be erected to the bridge affecting the normal navigable route beneath the structure.
Width of Navigation reduced by half beneath the bridge.
Follow directional signage on site. Do not pass another craft directly beneath the bridge. Follow any instructions given by the contractors staff.
(Enquiries: 01132816860)
Restriction: Bridge 14 Calderway Bridge, Elland
Associated Regional Office: BW YorkshireHeadroom is restricted for maintenance painting of third party bridge requiring scaffolding.
Please follow the instructions of the contractor’s staff on site. A delay of 20 minutes may be possible during the installation and removal of scaffolding, for the works to be made safe.
(Enquiries: 0113 2816860)
Stoppage: Ganny Lock
Associated Regional Office: BW YorkshireReplacement of gates and cills to include general repairs
Towpath diversion will be in place with appropriate signage.
(Enquiries: 01642 633273)
Stoppage: Ledgard Lock
Associated Regional Office: BW YorkshireReplacement of flood gates to include general repairs
This section will be closed from Mirfield Town Centre to Ledgard Flood Lock. Diversion will be signed.
(Enquiries: 01642 633273)