Stoppages Results
Works which make up part of the 2010-2011 winter stoppage programme have been highlighted in blue
Results 1-29 of 29
Grand Union Canal »
-
Advice: British Waterways' Hatton office
02 Nov 2009 until further notice
Associated Regional Office: West Midlands Waterways
Please note that the main BW Hatton office is no longer selling BW merchandise such as licences, pump out cards and BW keys. These can be purchased at Fazeley or online at www.waterscape.com/shop. Alternatively, telephone BW customer services on 0845 6715530.
(Enquiries: 0845 6715530)
-
Opening Times: Customer Service Facility at Brentford Office
01 Apr 2010 until further notice
Associated Regional Office: London Waterways
There are is longer British Waterways' customer service facility at Brentford. It is possible to buy service and electricity cards at the Riverside Cafe, unit 1, Brentford Lock - in the plaza behind the Gauging Locks.
British Waterways customer services are available at the Docklands office. 420 Manchester Road, London E14 9ST
Contact: enquiries.london@britishwaterways.co.uk or 020 7985 7200, www.waterscape.com.
Opening hours: 9.30 am - 4.30 pm, weekdays.(Enquiries: 0207 985 7200)
-
Advice: Opposite the Rickmansworth Waste Water Treatment Plant, about 730 m north of Copper Mill Lock (Lock 84
24 Sep 2010 until further notice
Associated Regional Office: London Waterways
Repair of power cable. Works area partly occupies the towpath. The footpath remain open for passing the worksite.
(Enquiries: 0207 985 7200)
-
Advice: Blisworth Tunnel - Wide Beam Passage
06 Jun 2011 until further notice
Associated Regional Office: South East Waterways
UPDATE (06 June 2011): Please be advised the original notice displayed the incorrect tunnel length.
Correct tunnel length: 2812m
(Enquiries: Please see description)
-
Advice: Braunston Tunnel - Wide Beam passage
06 Jun 2011 until further notice
Associated Regional Office: South East Waterways
Wide Beam boats wishing to travel through Braunston Tunnel must book passage.
Passage is available Monday-Saturday at 8am ONLY and must be booked 48hrs in advance. Passage is not available on Sundays or Bank Holidays
Unfortunately if you do not make your 8am slot you will have to wait to travel through the tunnel on the next available day. This is to reduce the disruption to other users of the canal needing to travel through the tunnel.
Tunnel length: 1873m
Travel time: 30 minutes (approx.)
To book passage please call one of the two contacts:
Steve Morgan 07711 796 384
Alex Goode 07917 261 411Or alternatively you may wish to send your request to enquiries.southeast@britishwaterways.co.uk
(Enquiries: Please see description above)
-
Restriction: Winding Hole in Paddington Basin
15 Jun 2011 until further notice
Associated Regional Office: London Waterways
Mooring rings have recently been installed on the pathway at the very end of Paddington Basin, beyond the pontoons. This has been done in advance of planned works to create further visitor berths at this site. These rings should not be used for mooring at this time as this area of waterspace is a winding hole - mooring at this location will reduce the width of the navigation and incur a risk of collision between craft. Customers should moor in alternative berths in the basin or at the Little Venice Visitor Mooring Site nearby. British Waterways are unfortunately unable to accept responsibility for any damage due to collisions resulting from this 'No Mooring' instruction not being followed.
(Enquiries: 020 7985 7200)
Aylesbury Arm (Grand Union Canal) »
-
Stoppage: Grand Union Canal Aylesbury Arm
29 Sep 2011 until further notice
Associated Regional Office: South East Waterways
UPDATE (22 December 2011): For the duration of the Christmas/New Year period from 23rd December - 3rd January 2012 the Aylesbury Arm will be open to all boating traffic.
(Enquiries: Ian Final 07717 660 205)
Grand Union Canal »
-
Restriction: Grand Union Canal Cowroast Lock 46
26 Oct 2011 until further notice
Associated Regional Office: South East Waterways
On going vandalism is leaving canal pounds empty and wasting limited water resources. For this reason Lock 46 will only be open between 8:30am - 4:30pm daily as of 26th October 2011.
We apologise for any inconvenience caused.
(Enquiries: Ian Final 07717 660 205)
Paddington Arm (Grand Union Canal) »
-
Opening Times: Jena Customer Services
22 Dec 2011 until further notice
Associated Regional Office: London Waterways
Jena will close on Thursday 22nd 2011, Christmas break will then follow with the Docklands office(420 Manchester Road E14 9ST) being the new front of house 5 days a week 09.30-4.30 Monday – Friday from January 3rd 2012.
Facility cards can be purchased from the Waterside cafe in Little Venice Pool.
For any further questions please do not hesitate to contact the customer service team: enquiries.london@britishwaterways.co.uk or 020 7985 7200
(Enquiries: 020 7985 7200)
Grand Union Canal »
-
Stoppage: Winkwell Swingbridge. Bridge 147
04 Jan 2012 - 09 Mar 2012
!This stoppage has been cancelled.
Associated Regional Office: South East Waterways
UPDATE (12 December 2011): Following investigation of the works to be carried out, it has been identified that a full stoppage is not required.
Works will be carried out with only short restrictions to navigation.
(Enquiries: 01923 201120)
-
Stoppage: Cosgrove Iron Trunk Aqueduct
04 Jan 2012 - 09 Mar 2012
Associated Regional Office: South East Waterways
UPDATE (17 January 2012): The works to the aqueduct are now being carried out without dewatering the canal. However, boats being used by the contractor will be blocking the canal to navigation.
It is possible that limited passage may be possible, but British Waterways are unable to guarantee this.
For the purposes of journey planning please assume the canal is closed.
(Enquiries: 01923 201120)
The towpath is also closed
Northampton Arm (Grand Union Canal) »
-
Stoppage: Northampton Arm Locks 1 to 17
09 Jan 2012 - 10 Feb 2012
Associated Regional Office: South East Waterways
UPDATE (19 January 2012): In order to carry out additional repairs to leaking lock gates, this stoppage will be extended until 10 February 2012.
The additional repairs are aimed at reducing water losses down the Northampton Arm and hence conserving water for the main summer boating season. The repairs are particularly important due to the continued period of regional drought.
We apologise for any inconvenience caused.
(Enquiries: 01923 201120)
Grand Union Canal »
-
Stoppage: Tring Summit-Lock 39 Startops Reservoir-Bluebells Cafe and Lock 49 - Northchurch
11 Jan 2012 until further notice
Associated Regional Office: South East Waterways
UPDATE (10 January 2012): In response to customer requests for a longer window to exit the affected area, we have extended the period that the section between Cowroast Marina and Lock 39 will remain open for use.
As planned, planks will be installed at Cowroast Marina during the morning of Thursday 12 January. This means that by the end of Wednesday 11 January, boats must be on the correct side of the Cowroast planks or within the planked off area if applicable. At this time, we will stop feeding water to the Tring Summit from the reservoirs.
Between 9am and 12pm on Saturday 14 January, British Waterways staff will man locks to assist and marshal boats out of the section between the planks north of Cowroast Marina and Lock 39. All boats wishing to leave the area will have to move north and exit through Lock 39 by 12pm on Saturday, to avoid being grounded within the lowered section. At this time, Lock 39 will be locked. We would ask that any boats which are able to move out of the section before this date do so as soon as possible, to avoid undue congestion on Saturday.
Many thanks for your assistance.
Please click on 'Show History' within Waterscape to read other important information about this stoppage
(Enquiries: 01908 302 500)
Northampton Arm (Grand Union Canal) »
-
Advice: Grand Union Canal - Northampton Arm Lock 17
13 Jan 2012 until further notice
Associated Regional Office: South East Waterways
A BW key is required for entering the Northampton Arm from the River Nene. A key must be purchased in advance from any of the Waterway offices or online via Waterscape.
Beware of changes in River levels as you enter the River Nene. For further information, contact the Environment Agency Floodline: 0845 9881188
(Enquiries: 01908 302 500)
Grand Union Canal »
-
Advice: Grand Union Canal - Braunston Stop House
13 Jan 2012 until further notice
Associated Regional Office: South East Waterways
Opening times - Friday 10am - 4pm
(Enquiries: Trish Fox 01908 681 277)
-
Advice: Grand Union Canal Lock 19 Stoke Bruerne Slipway
13 Jan 2012 until further notice
Associated Regional Office: South East Waterways
For access via the slipway at Stoke Bruerne Lock 19 please email your request to enquiries.southeast@britishwaterways.co.uk
(Enquiries: 01908 302 500)
-
Advice: Grand Union Canal - Gayton Yard Slipway
13 Jan 2012 until further notice
Associated Regional Office: South East Waterways
For access via the slipway at Gayton Yard please email your request to enquiries.southeast@britishwaterways.co.uk
(Enquiries: 01908 302 500)
-
Advice: Grand Union Canal - Winkwell Swing Bridge (Bridge 147)
13 Jan 2012 until further notice
Associated Regional Office: South East Waterways
Winkwell Swing Bridge is push-button operated and a BW key is required. A key must be purchased in advance from any of the Waterway offices or online via Waterscape.
(Enquiries: 01908 302 500)
-
Restriction: Bridge 147, Winkwell Swingbridge
23 Jan 2012 - 30 Mar 2012
Associated Regional Office: South East Waterways
Works are required to repair the bridge decking plus mechanical and electical components.
Whilst repairs are carried out there may be short delays with boats having to wait for no more than 2 hours. We apologise for any inconvenience caused.(Enquiries: 01923 201120)
-
Stoppage: Mentmore Wharf 2 Marina
01 Feb 2012 - 09 Mar 2012
!This stoppage has been cancelled.
Associated Regional Office: South East Waterways
UPDATE (30 January 2012): Due to delays with the planning consent for this marina development, this stoppage has now been cancelled.
(Enquiries: 01923 201120)
-
Stoppage: Sappi Graphics, Nash Mills
01 Feb 2012 - 09 Mar 2012
Associated Regional Office: South East Waterways
Third party works to install a footbridge over the canal.
(Enquiries: 01923 201120)
-
Stoppage: Stoke Bruerne Locks 14 to 20
06 - 24 Feb 2012
Associated Regional Office: South East Waterways
UPDATE (19 January 2012): Due to a requirement to carry out additional gate leak repairs at the Northampton Arm stoppage, this stoppage at Stoke Bruerne will now commence on 6 February 2012. Works will still be completed as planned on 24 February 2012.
The change in our plans is as a result of the reprioritisation of lock gate leaks due to the continued period of regional drought.
(Enquiries: 01923 201120)
-
Stoppage: Winkwell Lock 60
06 - 24 Feb 2012
Associated Regional Office: South East Waterways
Replacement of top and bottom gates. General repairs to lock structure.
(Enquiries: 01923 201120)
-
Advice: Grand Union Canal Cosgrove Lock Car Park
13 - 24 Feb 2012
Associated Regional Office: South East Waterways
To allow works to improve Cosgrove Lock Car Park, it will be necessary to close it completely to vehicle access during this period.
Works will start on 13th February and will be complete by 24th February. All cars will be required to vacate the car park prior to the start date.We apologise for any inconvenience caused.
(Enquiries: James Clifton 01908 302 500)
-
Stoppage: Welsh Road Lock 18
13 - 24 Feb 2012
Associated Regional Office: South East Waterways
Repairs to lock gates to stop leaks plus general repairs to lock structure.
(Enquiries: 01923 201120)
-
Stoppage: Bascote Lock 17, Grand Union Canal
27 Feb 2012 - 09 Mar 2012
Associated Regional Office: South East Waterways
Due to ongoing drought conditions, we will be carrying out additional winter stoppage works at Bascote Lock 17. These works are required to reduce water losses through the gates and paddles and are necessary to try to conserve water for the main 2012 summer boating season.
Works will take place between 27 February and 9 March 2012.
We apologise for any inconvenience caused.
(Enquiries: 01908 302500)
-
Stoppage: Fishery Lock 63
27 Feb 2012 - 09 Mar 2012
Associated Regional Office: South East Waterways
Repair to leaking bottom gates plus general repairs to top gates and lock structure.
(Enquiries: 01923 201120)
-
Stoppage: Braunston Locks 1 to 6
27 Feb 2012 - 09 Mar 2012
Associated Regional Office: South East Waterways
Repairs to lock gates to stop leaks plus general repairs to lock structures
(Enquiries: 01923 201120)
Paddington Arm (Grand Union Canal) »
-
Restriction: Kensal Green to Paddington Basin
03 Jul 2012 - 10 Sep 2012
Associated Regional Office: London Waterways
As part of the Olympic security requirements access to and navigation between Kensal Green and Paddington Basin will need to be pre-arranged with ourselves, further details may be found at;
http://www.waterscape.com/features-and-articles/news/3190/plan-ahead-for-your-olympic-boating-summerhttp://www.waterscape.com/in-your-area/london/olympic-moorings
For all enquiries relating to restrictions on Londons Waterways during the Olympics please email olymoorings@britishwaterways.co.uk
(Enquiries: 0207 985 7315)
Results 1-29 of 29