Stoppages Results
Works which make up part of the 2010-2011 winter stoppage programme have been highlighted in blue
Results 1-11 of 11
Leeds & Liverpool Canal »
-
Restriction: Bridge 131, Colne Road Bridge, Burnley
21 Sep 2009 until further notice
Associated Regional Office: BW North-West
A restriction to through navigation is required on the Leeds & Liverpool Canal at Bridge 131, Colne Road Bridge due to an unstable 3rd party owned retaining wall on the offside of the Canal. The wall is located slightly east of Bridge 131.
A barrier has been installed at this location and passing boats are advised to keep to the towpath side.
Please accept our apologies for any inconvenience caused.
(Enquiries: 01942 405700)
-
Opening Times: Leeds & Liverpool Canal
12 - 11 Mar 2012
Associated Regional Office: North West Waterways
UPDATE (10 March 2011): LEEDS & LIVERPOOL CANAL
OPENING TIMES BETWEEN BINGLEY FIVE RISE & LEEDS BASIN
2011
Bingley Five, Three Rise Locks & Field Lock
First Passage Last Passage
12 March to 31 October 2011 8.15am 4.00pm
21 March to 31 August 2011 (Bank Holidays and local school holidays) 8.15am 6.00pm
Easter Holidays 22 April - 25 April
Royal Wedding 29 April
Bank Holiday 2 May
Spring Hols 30 May – 3 June
Summer Hols 25 July – 31 AugustAfter the last passage time, Bingley Five Rise, Three Rise and Field Lock will be locked up until the following morning.
Newlay Lock to Spring Garden Lock
Open daily from 12 March until 31 October 2011
First Passage Last Passage
Newlay Top Lock to Kirkstall Lock 08.15am 3.00pm
Kirkstall Lock to Newlay top Lock 08.15am 3.00pm• The time restrictions have been put in place for user safety and to conserve water.
• The last passage time will ensure you pass through all the locks between Newlay and Kirkstall Lock before 4.00pm.
• Staff will usually be in attendance during working hours in the summer months to provide assistance.
• Overnight mooring is available between Office Lock and Kirkstall and also at Rodley Visitor Moorings.Please Note. After 4.00pm all locks between Newlay and Kirkstall Lock will be locked up until the following morning. Non-Stop passage is advised on this section.
PLEASE NOTE - PASSAGE DURING WINTER
PLEASE REMEMBER THAT PASSAGE DURING THE WINTER MUST BE BOOKED WITH A MINIMUM OF 72 HOURS NOTICE.
THIS IS FROM 31 OCTOBER 2011 UNTIL 11 MARCH 2012. SATURDAY/SUNDAY CLOSED.
Opening times during winter First Passage Last passage
Bingley Five & Three Rise 08.15am 3.00pm
Field Lock 08.15am 3.00pm
Newlay Top Lock to Kirkstall 08.15am 2.30pm
Kirkstall to Newlay Top Lock 08.15am 2.30pmContact the Administration Team for full booking information on 01942 405700, Monday to Friday between 9.00am and 4.30pm.
We apologise for any inconvenience these restrictions may cause
(Enquiries: 01942405700)
-
Stoppage: Foulridge Service Station
28 Apr 2011 until further notice
Associated Regional Office: North West Waterways
UPDATE (13 January 2012): Repair works have now commenced on site & this and will last for approx. two weeks
An update will be provided on 18 January 2012.
British Waterways apologise for any inconvenience caused
(Enquiries: 01942 405700)
-
Advice: Leeds & Liverpool Canal, Between bridge 129b (Mitre Bridge) and bridge 130 (Sandygate Bridge)
03 Jan 2012 - 20 Mar 2012
Associated Regional Office: North West Waterways
Information only, no restriction to towpath or navigation.
To allow for 3rd party works to facilitate scaffold installation, building refurbishment and scaffold removal.
Work is expected to run for approximately 12 weeks.Please do not moor boats against the scaffold
British Waterways apologise for any inconvenience this may cause.
(Enquiries: 01942405700)
-
Restriction: Leeds & Liverpool canal,Crabtree Swing Bridge, Burscough
03 Jan 2012 - 16 Mar 2012
Associated Regional Office: North West Waterways
Navigation and Towpath Restriction, Maximum waiting time of 1 Hour during Major Works operations for
mechanisation of Swing Bridge for user Operation.Works will also be subject to a Road Closure; therefore access to the Canal at this point will be restricted.
British Waterways apologise for any inconvenience this my cause.
(Enquiries: 01942405700)
-
Stoppage: Bingley Five Rise
04 Jan 2012 - 09 Mar 2012
Associated Regional Office: North West Waterways
Gate replacement works
(Enquiries: 01923 201120)
Leigh Branch (Leeds & Liverpool Canal) »
-
Stoppage: Plank Lane Lift Bridge, Bridge 7
09 Jan 2012 - 09 Mar 2012
Associated Regional Office: North West Waterways
Replacement of bridge deck
(Enquiries: 01923 201120)
Leeds & Liverpool Canal »
-
Restriction: leeds & Liverpool canal, between Bridge 102 and 102a
06 - 24 Feb 2012
Associated Regional Office: North West Waterways
Information only.
3rd party works are being carried out at this location & should not impact on the navigation or the use of the towpath.
It is to facilitate installation of new sewer under the canal via tunnel technique.(Enquiries: 01942405700)
-
Stoppage: Dowley Gap Aqueduct
06 - 17 Feb 2012
Associated Regional Office: North West Waterways
Leakage investigation and repair works.
(Enquiries: 01923 201120)
The towpath is also closed
-
Stoppage: Wigan Flight Lock 83
06 - 17 Feb 2012
Associated Regional Office: North West Waterways
Leakage investigation and repair works
(Enquiries: 01923 201120)
-
Stoppage: Haigh Park Bridge 60
20 Feb 2012 - 23 Mar 2012
Associated Regional Office: North West Waterways
UPDATE (12 January 2012): The Planned Work for this location has been delayed & is now rescheduled.
the work will be carried out in 2 phases with phase 1 commencing on 20.02.2012 until 23.03.2012.
Phase 2 should not have any impact on navigation.
(Enquiries: 01923 201120)
The towpath is also closed
Results 1-11 of 11